Skip Navigation
Projects - GWL-Waterfall-edited
Projects - TSW-Homepage-2

Waterway Structures and Hydro Power

Trent Severn Waterway Infrastructure

The overall project goal is to repair or replace assets in poor condition with similar structures while maintaining important cultural and heritage elements of the original construction.

Projects - bow-city-featured-5

Self-Storage

Real Storage - Bow Trail

A Design/Bid/Build contract for the construction of the 130,000sf, 6-storey self-storage facility in the west end of Downtown Calgary.

Projects - legacy-feature2

Industrial and Advanced Manufacturing

Legacy Business Centre

Legacy Business Centre houses 193,910 sf industrial condos over two buildings. Built by Maple Reinders for Beedie Construction, the individual condos range from 11,000 sf to 17,000 sf.

Projects - Grenda-Feature-image-2

Institutional

H.S. Grenda Middle School

H.S. Grenda Middle School accommodates 600 students for the District of Lake Country. The modern three-storey middle school consists of open Learning Studios complete with overhead operational doors which connect to adjacent outside spaces creating a multi-user learning studio.

Projects - feature-blueird-matheson-1

Self-Storage

Bluebird Self-Storage, Matheson

Maple Reinders was awarded the Design-Build contract for Bluebird's five-storey self-storage facility located in Mississauga, ON. The new facility includes approximately 140,000 SF of space comprised of storage units and a small office and retail area.

Projects - Untitled-1

Food and Beverage

Americold Phase 4

Maple Reinders undertook the Phase 2 and 3 extensions to their existing facility in Calgary. Which included construction of the 134,000 SF freezer/cold storage warehouse utilized reinforced concrete strip footings and pads, structural steel, insulated metal panels, SBS roofing.

Projects - Americold-Feature-img

Food and Beverage

St. Francis Herb Farm

Maple Reinders undertook the Phase 2 and 3 extensions to their existing facility in Calgary. Which included construction of the 134,000 SF freezer/cold storage warehouse utilized reinforced concrete strip footings and pads, structural steel, insulated metal panels, SBS roofing.

Projects - conge-feature-image

Commercial

Congebec Freezer Building Expansion

Maple Reinders undertook the Phase 2 and 3 extensions to their existing facility in Calgary. Which included construction of the 134,000 SF freezer/cold storage warehouse utilized reinforced concrete strip footings and pads, structural steel, insulated metal panels, SBS roofing.

Projects - Ellis-Parc-Residential-Featured-Image

Multi-Residential

Ellis Parc Mixed-Use Development

Construction Management contract to oversee the pre-construction and construction of this 91 story multi-residential building.

Projects - GFS-Hero

Food and Beverage

Gordon Food Service, East Toronto DC

Presently constructing a greenfield food distribution center for Gordon Food Service in Ajax, Ontario.

Projects - HamiltonBiosolids-Hero

Organics Waste Management

Hamilton Biosolids Management

Maple Reinders, as part of the Harbour City Solutions consortium, was selected to build the Hamilton Biosolids Management project. The project is being delivered through a PPP using the design-build-finance-operate-maintain model, with a 30-year contract operations term.

Projects - CRD-Hero

Organics Waste Management

CRD Residuals Treatment Facility

This facility marks the fourth Canadian environmental project which we will deliver under the Public Private Partnership format, a first amongst its fellow Canadian contractors.

Get Us Working for You

Have a question about any of the projects you’ve seen? Get in touch, we love talking about our work.

Form Template
Select a Form Template
Available fields in the selected template:
required field.
Invalid email format.
Some of the fields are not filled or invalid.
Templates Library
Loading, Please wait...
The Library cannot be open, please try it again later.