Work on this project involved construction of a new distribution centre including a 510,000 SF warehouse and a 25,000 SF two-storey office space.
The project features the client’s installation of a three-storey bin module racking system and general racking system for bulk storage, aerosols and flammable materials. A conveyor system was installed throughout the warehouse and integrated within the bin module structure. Maple Reinders was retained to provide safety supervision for the owner’s trades who were installing the bin module, conveyors and bulk storage racking as these systems require a high level of integration with each other and with the rest of the building services.
The new Acklands Grainger distribution centre is LEED® Certified and contains many energy efficient measures such as high insulation walls and roof, high performance glazing, efficient light fixtures with extensive use of occupancy sensors, high efficiency Carrier HC series rooftop units and BAS system controls.
Constructed the Churchill Meadows Christian Church, which is a worship facility with a 650-seat theatre-style auditorium that includes an expansive podium and backstage green room facilities.
The first P3 project for municipal wastewater treatment in Canada, the Lac La Biche project involved the design, build (including procurement) and operation of a new 4,500m³/day Biological Nutrient Removal (BNR) wastewater treatment facility, in addition to a new lift station and forcemain the County of Lac la Biche in northern Alberta.
View All
Commercial
Commercial, Food and Beverage
Dot Foods Inc., the largest food redistributor in North America, selected Maple Reinders to act as their Design-Builder for their flagship Canadian Head Office and Distribution Center.
Sobeys Inc., selected Maple Reinders as their construction partner to build a 55,000 sf ready-to-eat food processing commissary facility in Calgary, Alberta.