Maple Reinders was selected by Aisin Canada to design and construct a major expansion to its injection moulding facility in Stratford, Ontario. Aisin Canada is part of the Toyota Group and is a leading global automotive supplier.
Following a comprehensive procurement process, Maple was chosen to deliver the project. The award further strengthens Maple’s relationship with one of its largest automotive clients.
The approximately 145,000-square-foot expansion will increase Aisin Canada’s manufacturing and storage capacity. It will support current operations while providing space for future growth across North America.
The Stratford facility houses injection moulding and assembly equipment used to produce sunroof systems. These systems are supplied for Toyota vehicles assembled in Cambridge and Woodstock.
The expansion includes both heavy and light manufacturing areas. The heavy manufacturing space features reinforced and thickened concrete slabs designed to support injection moulding equipment. The light manufacturing area will support assembly operations. New high-bay storage will also provide additional space for finished goods.
Maple is also expanding Aisin’s existing office and employee areas. The project will double the size of the current office space and add a new cafeteria, meeting room, washrooms and other support spaces.
Careful planning and coordination were important throughout construction. A large amount of excavated material had been stockpiled on the property during construction of the original facility. This material needed to be removed to make way for the new expansion. Maple coordinated the removal while maintaining progress across the site.
The expanded facility now provides Aisin Canada with additional capacity to support ongoing production for Toyota and gives the company greater flexibility to pursue new opportunities with automotive manufacturers across North America.
Maple Reinders delivered a 157,000 square foot specialized manufacturing facility for Siltech Corporation in Fort Erie, Ontario, integrating production, research, warehousing and office spaces with advanced safety and containment systems designed to support silicone manufacturing operations.
Maple Reinder undertook the Calgary Lofts Project, which converted the 11-storey Optima Place, originally built in 1981, from an office building into 56 residential suites under the City of Calgary's incentive program.
View All
Industrial and Advanced Manufacturing
Maple Reinders delivered a 58,000 square foot expansion to Lineage’s temperature-controlled logistics facility in Vaughan, Ontario, adding more than 11,000 pallet positions while integrating new freezer systems, sustainable features and infrastructure within the active facility.
Commercial
Maple Reinders provided pre-construction and construction services for a 147,585 square foot, six-storey XYZ Storage facility in Toronto, Ontario, featuring more than 1,400 storage units and a modern vertical design that maximizes space on a constrained urban site.
Institutional
Maple Reinders designed and constructed the 163,600 square foot Royal BC Museum PARC Collections and Research Building in Colwood, British Columbia, featuring mass timber construction and specialized spaces to preserve the Province’s collections while supporting research, education and public access.
Get Us Working for You
If you have a project youd like to speak to us about, or would like to learn more about our service capabilities, click the link below.
Speak to the Right Team