Maple Reinders was awarded a Design-Build contract by Gordon Food Services for the expansion of their facility in Milton. The expansion consisted of two additions at each end of the building, plus new parking for trailer and car parking areas.
The North addition was approximately 150,000 SF and consisted of a freezer, cooler, cooler dock, and office area. The South addition was approximately 27,000 SF of ambient warehouse. Much coordination was required as the existing building and parking areas were in operation 24×7 during construction, and Maple Reinders also had to tie into the existing building for water, fire protection systems, and refrigeration systems while in operation.
Grey Container – do not delete or move.
View All
Industrial and Advanced Manufacturing
Maple Reinders delivered a 58,000 square foot expansion to Lineage’s temperature-controlled logistics facility in Vaughan, Ontario, adding more than 11,000 pallet positions while integrating new freezer systems, sustainable features and infrastructure within the active facility.
Commercial
Maple Reinders provided pre-construction and construction services for a 147,585 square foot, six-storey XYZ Storage facility in Toronto, Ontario, featuring more than 1,400 storage units and a modern vertical design that maximizes space on a constrained urban site.
Institutional
Maple Reinders designed and constructed the 163,600 square foot Royal BC Museum PARC Collections and Research Building in Colwood, British Columbia, featuring mass timber construction and specialized spaces to preserve the Province’s collections while supporting research, education and public access.
Get Us Working for You
If you have a project you would like to speak to us about, contact us today.
Contact Us