Skip Navigation

Legacy Business Centre

Legacy Business Centre - legacy-feature2
Gradient
  • Client

    Beedie Construction

  • Size

    193, 910 SF

  • Completed

    2021

  • Location

    Mississauga, ON

  • Delivery Models

    Design/Bid/Build

  • Market

    Industrial and Advanced Manufacturing

Legacy Business Centre

Legacy Business Centre is centrally located in the coveted Mississauga market within the Greater Toronto Area. This premier development, consisting of two buildings, offers a total of 193,910 square feet of industrial condos. Built by Maple Reinders for Beedie Construction, these condos range in size from 11,000 square feet to 17,000 square feet, providing businesses with the opportunity to own commercial real estate within a professionally managed development. Notably, this project marks Beedie’s first foray into Ontario, with additional similar projects planned for the Greater Toronto Area and Alberta.

The buildings themselves boast several impressive features, including concrete tilt-up insulated panels, ensuring durability and thermal efficiency. Each bay is equipped with both dock and grade loading options, accommodating diverse logistical needs. With 26-foot clear height ceilings, businesses benefit from ample vertical space. High-efficiency LED warehouse lighting enhances energy savings and illumination. Mezzanine areas offer extra storage or office space, maximizing functionality. Additionally, the buildings incorporate warehouse skylights, allowing natural light to fill the space and creating a vibrant working environment.

Grey Container –  do not delete or move.

Legacy Business Centre - legacy-intro

Previous Project

Station One Architects

H.S. Grenda Middle School

H.S. Grenda Middle School accommodates 600 students for the District of Lake Country. The modern three-storey middle school consists of open Learning Studios complete with overhead operational doors which connect to adjacent outside spaces creating a multi-user learning studio.

Next Project

Westbrook School K-8

The construction of the school took place while the existing Westbrook School (built in 1953) was in use for an entire school year. The contract included abatement and demolition of the existing school which was undertaken during the summer break.

Get Us Working for You

If you have a project youd like to speak to us about, or would like to learn more about our service capabilities, click the link below.

Form Template
Select a Form Template
Available fields in the selected template:
required field.
Invalid email format.
Some of the fields are not filled or invalid.
Templates Library
Loading, Please wait...
The Library cannot be open, please try it again later.