Lulu Island WWTP Primary Effluent Gates Isolation

Lulu Island WWTP Primary Effluent Gates Isolation - Lulu-Island-WWTP_Feature
Gradient
  • Client

    Metro Vancouver

  • Completed

    2016

  • Location

    Richmond, BC

  • Delivery Models

    Design/Bid/Build

  • Market

    Process Mechanical

Story

Work on this project involved the supply and installation of new channel bulkhead gates in the live primary effluent channel supply, which required the supply and installation of temporary bulkheads for channel isolation during construction. Work also involved the cutting and removal of a portion of the channel concrete roof deck for gate and frame installation, replacement of the removed platform concrete supports with a new structural aluminum frame, and the supply and installation of a new ladder to access existing aluminum platform and relocate electrical cables and level transmitter to accommodate the new layout of the platform area.

Previous Project

North West Langley WWTP

Northwest Langley Wastewater Treatment Plant serves a population of 27,000 residents within the Walnut Grove area of Langley, B.C

Next Project

Nova Cold Expansion

Maple Reinders undertook the Phase 2 and 3 extensions to their existing facility in Calgary. Which included construction of the 134,000 SF freezer/cold storage warehouse utilized reinforced concrete strip footings and pads, structural steel, insulated metal panels, SBS roofing.

Get Us Working for You

If you have a project you would like to speak to us about, contact us today.

Form Template
Select a Form Template
Available fields in the selected template:
required field.
Invalid email format.
Some of the fields are not filled or invalid.
Templates Library
Loading, Please wait...
The Library cannot be open, please try it again later.