Oxford Properties Group
79,436 sf
2020
Burnaby, BC
Design/Bid/Build
Commercial
Maple Reinders was awarded the contract by Oxford Properties Group for the construction of a new 79,000 sf warehouse, manufacturing and office facility. The scope of work included all related site work and services, tilt-up concrete panel construction, with curtain wall architectural features.
Located in Burnaby, British Columbia, this warehouse base building consists of 17 loading bays, two truck access ramps, an end-of-trip, parking area, landscaped stormwater management and two exterior garbage enclosures. The building is LEED certified.
The project included a sequenced build including the construction and commissioning of the new headworks, followed by the demolition of the old headworks structure.
Maple Reinders constructed a new three-storey self storage facility that includes approximately 71,000 sf of floor area with storage lockers and a small retail office.
View All
Maple Reinders undertook the Phase 2 and 3 extensions to their existing facility in Calgary. Which included construction of the 134,000 SF freezer/cold storage warehouse utilized reinforced concrete strip footings and pads, structural steel, insulated metal panels, SBS roofing.
Maple Reinders completed the Design-Build contract for the construction of this two-storey youth centre for the Trinity Baptist Church, located in Kelowna, British Columbia.
Maple Reinders was contracted Design and Build a 36,563 SF building, consisting of two floors with individual units ranging from 900 SF to 10,000 SF. The facility houses Ontario’s first Family Healthcare practice as well as other healthcare practitioners and general business offices.
Get Us Working for You
If you have a project youd like to speak to us about, or would like to learn more about our service capabilities, click the link below.
Speak to the Right Team