SSTI Granite Pickering LLC
120,540 SF
2016
Pickering, ON
Design/Build
Self-Storage
One of several projects that Maple Reinders has been able to design and build for SmartStop Self Storage, this project entailed the conversion of a one-storey existing warehouse to two-storeys of self-storage totaling approximately 72,000 SF of self-storage, including an elevator lobby.
The conversion also consisted of two-storeys of rentable office spaces along the front of the property. A 500 SF retail addition was constructed on the corner of the existing building as an office space for SmartStop employees, as well as for clients to access rented locker units and office spaces.
To limit energy usage when the building is vacant, motion sensor lighting was used throughout the facility. The facility is also equipped with LED lighting within all the office spaces, corridors and retail addition. All exterior lighting is LED as well.
Maple Reinders has since been awarded Phase 2 of the project, consisting of a 40,000 SF, two-storey addition, constructed with insulated metal panels with glazing and architectural features on the north elevation.
View All
Maple Reinders undertook the Phase 2 and 3 extensions to their existing facility in Calgary. Which included construction of the 134,000 SF freezer/cold storage warehouse utilized reinforced concrete strip footings and pads, structural steel, insulated metal panels, SBS roofing.
Maple Reinders was awarded the Design-Build contract for Bluebird's five-storey self-storage facility located in Mississauga, ON. The new facility includes approximately 140,000 SF of space comprised of storage units and a small office and retail area.
Maple Reinders constructed Nationwide Self-Storage’s new facility with an eco-friendly Car Wash facility in Kamloops, British Columbia.
Get Us Working for You
If you have a project you would like to speak to us about, contact us today.
Contact Us